News 
 Local News 
 News 
 General 
 Wind power tests ready for take-off 

Wind power tests ready for take-off

04 Nov, 2009 12:00 AM
MORNINGTON Peninsula Shire is spending $27,000 to test wind power potential at three locations on the peninsula.

It has hired Brunswick-based renewable energy consultants Enhar to conduct a six-month test at Hastings, Mt Martha and Red Hill.

The company has installed wind measuring devices, or anemometers, with data loggers atop 10-metre poles on the roof of Pelican Park aquatic centre on the foreshore at Hastings, on one of the highest parts of The Briars Park at Mt Martha and on a light pole at Red Hill recreation reserve.

All are shire-owned properties. The installations at Red Hill and Mt Martha are full weather monitoring stations.

The shire's manager of renewable resources Sophia Schyschow said the council had previously monitored wind at various sporting grounds to gauge watering needs but this was the first wind power test.

"We need average annual wind of about 4 to 5 metres per second for wind turbines at these sites to be viable," she said. "An early test at Red Hill showed wind of twice this speed.

"The shire is not intending to go into the business of generating wind power but this is part of a program to show residents that such systems could be viable."

Wind of 4-5 metres per second equates to about

14-18kmh.

The shire's sustainable energy officer Jarrod Filosa said other factors such as wind speed distribution (the amount of very high wind speed compared to low wind speed) will also impact the total energy output of a turbine.

"If the monitoring reveals available wind energy at the three locations is sufficient, the shire will install small-scale wind powered turbines to produce green electricity," he said.

"The turbines would act as an educational tool as well as a practical measure to reduce the region's reliance on coal-fired electricity."

Print
Increase Text Size
Decrease Text Size

comments


No comments yet. Be the first to comment below.

post a comment


Screen name  *
Email address  *
Remember me?
Comment  *
 
We invite and encourage our readers to post comments. Comments are moderated and will appear as soon as our editor has approved them. When posting comments you agree to be bound by our Terms and Conditions.
Blow hard: Left, Pelican Park in Hastings with the wind monitor on the roof at rear. Above, a close-up of the device.
Blow hard: Left, Pelican Park in Hastings with the wind monitor on the roof at rear. Above, a close-up of the device.

Most popular articles

1) Apple iPhone 4 32GB43 plans 1%
2) Apple iPhone 4 16GB44 plans 7%
3) HTC Desire4 plans 3%
4) Apple iPhone 3GS 8GB33 plans 1%
5) Sony Ericsson Xperia X10 Mini Pro37 plans 1%

Mobile Phones | Broadband Plans

Get the best deal at Fairfax Digital - Rural Press



The Mornington and Southern Peninsula Mail







Weather brought to you by:

Weatherzone

Navigate

Classifieds

More Ways to Read

Front Page

Current Issue
Privacy Policy | Conditions of Use | Advertising Terms | Copyright © 2010. Fairfax Media.
 SEND...
 SAVE...
 SHARE...